| Design of emergency drainage system at -200 level in Zhangcun Mine |
| An Yongye |
| Coal Industry Shijiazhuang Design and Research Institute Co., Ltd., Shijiazhuang 050051, China |
|
|
|
|
Abstract In order to improve the waterproof and disaster-resistant ability of Zhangcun Coal Mine, this paper compares and selects the disaster-resistant methods, the area of adding submersible pump, and the setting of drainage pipeline, and finally determines to set up submersible pump chamber near the 200 horizontal pump house, and to use the φ325mm×10mm drainage pipeline of the 200 horizontal drainage system to drain to the emergency drainage scheme of the surface water treatment station of Nanfeng Mine. The emergency drainage pump is arranged in the form of horizontal pump, and two BQ550-425/5-1000/W-S type mine explosion-proof submersible pumps are selected. After the maintenance and expansion of the bottom cross near the -200 pump house, it is used as the drainage chamber of the submersible pump. The total amount of roadway engineering is 55.5 m/1 077.25 m3. Zhangcun Mine - 200 level construction submersible pump emergency drainage system engineering total investment of 16.575 million yuan.
|
|
|
|
|
|
| [ 1 ] 国家煤矿安全监察局. 煤矿安全规程[ M ]. 北京:煤炭工业出
版社,2016.
[ 2 ] 国家煤矿安全监察局.煤矿防治水细则[ M ]. 北京:煤炭工业出版社,2018.
[ 3 ] 河北煤矿安全监察局河北省应急管理厅 关于印发河北省煤矿防治水管理办法的通知(冀煤安监〔2021〕33号).
[ 4 ] 国继征,尹汉卿,姚运全,等. 水源地质复杂矿井潜排系统探索与实施[ J ]. 建筑工程技术与设计,2014( 7 ):641.
[ 5 ] GB 51070 - 2014,煤炭矿井防治水设计规范[ S ].
[ 6 ] 李惠平. 矿井应急排水系统的设计[ J ]. 煤矿机电,2011( 6 ):30 - 32.
[ 7 ] 周情来,张 立,孙世珂. 矿山潜水泵强排系统设计与应用[ J ]. 中国科技纵横,2013( 16 ):95.
[ 8 ] 赵书忠,张晓四,宋建国. 矿用潜水泵在煤矿抗灾强排系统中的应用[ J ]. 煤炭工程,2012( 6 ):62 - 63. |
|
|
|