| Study on Optimization of advanced support in close distance coal seam working face |
| Zhao Yao, Shi Jiancheng |
| Shanxi Jinshen Energy Co., Ltd, Xinzhou 036500, China |
|
|
|
|
Abstract In order to solve the damage problem of advancing support in close distance coal seam and based on the engineering background of No.11103 Face of Ciyaogou Mine, the distribution of advance abutment pressure was studied by way of field measurement. The scope and size were greater in No.11103 Face than that close under the mined-out area of coal seam working face. Therefore, the original advanced support scheme was optimized. The original single hydraulic support and I-beam steel were replaced with advanced hydraulic support to support the roof. The results showed that the hydraulic support in advance did not appear obvious roof subsidence phenomenon. On the basis of the quality of on-site support, this method reduced intensity of labor and material consumption, improved the safety of the production process, realized automation, mechanization support, and achieved good supporting effect.
|
|
|
|
|
|
| [ 1 ] 刘 森. 综采工作面超前支护措施研究与应用[ J ]. 山东煤炭科技,2018( 6 ):53 - 54.
[ 2 ] 来明明. 超前支护在采矿工程中的应用研究[ J ]. 能源与节能,2018( 7 ):161 - 162.
[ 3 ] 任仲久. 近距离煤层下行开采下煤层回采巷道布置[ J ]. 煤矿安全,2018( 3 ):136 - 139.
[ 4 ] 侯拴贵. 近距离煤层下部综采工作面超前支护优化[ J ]. 山东煤炭科技,2019( 5 ):85 - 86,97.
[ 5 ] 燕子彪. 近距煤层下层煤开采超前支护距离探讨[ J ]. 同煤科技,2003( 3 ):10 - 10,12.
[ 6 ] 宋 权. 近距离煤层开采的矿压显现[ J ]. 山西化工,2008( 2 ):164 - 165.
7 ] 郑林杰,李新明. 巷道超前支护液压支架在跃进煤矿的应
用[ J ]. 中州煤炭,2013( 7 ):35 - 37.
[ 8 ] 王永伟. 煤矿回风巷自移式巷道超前支护液压支架的研制与应用[ J ]. 中国科技信息,2011( 17 ):138 - 139.
[ 9 ] 董春江. 芦岭煤矿掘进巷道超前支护方式的应用及选择[ J ].
矿业安全与环保,2002,29( 1 ):51 - 52.
[ 10 ] 范育青,汪华君,刘玉成,等. 近距离煤层下煤层回采巷道支护设计[ J ]. 煤矿安全,2016,47( 2 ):212 - 215. |
|
|
|