| Research and application of in-situ stress test technology in kilometer deep mine |
| Xing Shikun |
| Xingdong Mine, Jizhong Energy Group Co. Ltd., Xingtai 054000, China |
|
|
|
|
Abstract In order to grasp the distribution of in-situ stress field in Xingdong Mine, the in-situ stress measurement was carried out in 1224 working face. By comprehensively comparing the two commonly used methods of stress relief of hollow inclusion drilling and hydraulic fracturing, the hollow inclusion stress relief method is selected to measure the ground stress. Two measuring points were selected in the field. The test results show that the in-situ stress of Xingdong Mine is generally large, and the original rock stress field is mainly horizontal stress. The maximum lateral pressure coefficient of the two measuring points is 1.81. There is tectonic stress and the distribution of in-situ stress field is uniform, which provides basic data for the support design of Xingdong Mine.
|
|
|
|
|
|
| [ 1 ] 孙中想. 空心包体地应力测量方法研究及其应用[ D ]. 上海:上海交通大学,2020.
[ 2 ] 康红普,伊丙鼎,高富强,等. 中国煤矿井下地应力数据库及地应力分布规律[ J ]. 煤炭学报,2019,44( 1 ):23 - 33.
[ 3 ] 张延新,蔡美峰,王克忠. 平顶山一矿地应力分布特征[ J ]. 岩石力学与工程学报,2004,23( 23 ):4 033 - 4 037.
[ 4 ] 赵文生. 李粮店煤矿地应力分布规律及巷道稳定性分析[ D ]. 焦作:河南理工大学, 2013. |
|
|
|