|
|
|
| Study on water prevention and control technical scheme for the first mining face with pressure in No. 15 coal seam in Yuecheng Mine |
| Duan Yanfei |
| Shanxi Jincheng Anthracite Mining Group Corporation Ltd., Jincheng 048006, China |
|
|
|
|
Abstract The hydrogeological conditions of No. 15 coal seam in Yuecheng Mine was studied, and the mining conditions under pressure of the coal seam was evaluated. The first mining face 151302 of the No. 15 coal seam in Yuecheng Mine was taken as an example, the technology of water prevention and control in pressurized mining of the coal seam was studied, different water control schemes were determined, which provided reliable basis for the next step of water control work in the mine.
|
|
|
|
|
|
| [ 1 ] 许 峰. 工作面底板奥灰水综合探查与评价技术[ J ]. 能源与环保,2018,40( 6 ):26 - 30.
[ 2 ] 林旭东,王建美,王春海. 煤矿井下奥灰水突水危险区判别方法研究[ J ]. 煤炭科学技术,2015,43( 6 ):126 - 130.
[ 3 ] 朱术云,曹丁涛,周海洋,等. 采动底板岩性及组合结构对破坏深度的制约作用[ J ]. 采矿与安全工程学报,2014,31( 1 ):90 - 96.
[ 4 ] 陈娅鑫. 深部煤层开采矿井防治水技术研究[ D ]. 邯郸:河北工程大学,2011. |
|
|
|