|
Abstract Based on large numerical value of gas determination parameters in W4302 working face of Gaohe Mine, pre-drainage was adopted in high gas drainage position after analyzing the gas drainage condition. The result showed that the drainage rate achieved by 59.6%, with good control of gas overrun and meeting the safe production goal.
|