|
|
|
| Study on mining pressure law and roof control in fully mechanized working face with large mining height |
| Zhang Peng1, Zhao Jian2, Xu Xiangqian2 |
| 1. Sihe Mine, Jincheng Anthracite Coal Group Corporation Ltd., Jincheng 048019, China; 2. School of Resources and Safety Engineering, China University of Mining and Technology ( Beijing ), Beijing 100083, China |
|
|
|
|
Abstract In order to study the mining pressure law of 4322 fully mechanized working face with large mining height in Chengzhuang Mine, the stress value of roof was calculated by numerical simulation software FLAC3D. The peak of front abutment pressure was 22.6 MPa, and the peak was about 15 m in front of working face. To effectively control the working face roof, according to the working status of the support, the working resistance provided by the support was calculated. When the support worked in the given deformation state, the roof subsidence was large and did not meet the requirements of safety production. When the support worked in the limited deformation state, the hydraulic support with a support resistance of 12 000 kN was needed. According to the mining process of the large mining height working face, the working procedures of the middle support and the end support were studied.
|
|
|
|
|
|
| [ 1 ] 赵少军. 成庄矿4312工作面对接切眼的研究及运用[ J ]. 山西化工,2017,37( 1 ):101 - 103.
[ 2 ] 张旭东. 成庄矿3#煤顺层钻孔瓦斯抽采有效半径测试[ J ]. 能源与节能,2015( 8 ):166 - 167.
[ 3 ] 徐光亮. 成庄矿沿空掘巷窄煤柱宽度确定研究[ J ]. 煤炭工程,2016,48( 1 ):14 - 16.
[ 4 ] 蔡国起. 破碎顶板条件下的煤矿巷道围岩破坏机理及其控制
研究[ J ]. 煤炭与化工,2017,40( 6 ):1 - 3.
[ 5 ] 张 鹏,赵 健,许向前. 复用巷道小煤柱宽度及围岩应力研究[ J ]. 煤炭技术,2017,36( 10 ):61 - 63.
[ 6 ] 赵恩祺. 合理小煤柱尺寸的确定及分析[ J ]. 煤炭与化工,2017,40( 9 ):60-61,65.
[ 7 ] 谭云亮,吴士良,尹增德,等. 矿山压力与岩层控制[M].北京:煤炭工业出版社,2008:123 - 129.
[ 8 ] 石建军,师皓宇,包寿胜,等. 大倾角综采工作面液压支架参数设计及其与围岩关系[ J ]. 煤炭学报,2012,37( S2 ): 313 - 318. |
|
|
|