|
Abstract Based on the serious water affecting No. 2 mining area production in the east wing transportation roadway in Beiyangzhuang Mine, combined with hydrogeological conditions and roadway engineering, the two plan was compared, the mining plan after water was given, which reduced the negative effect to the maximum, achieving the mining condition.
|