| Soft Rock Aquifer Main Inclined Mine Shaft Construction Method Selection |
| LI Xing-cai, WANG Shu-gang |
| Shijiazhuang Coal Industry Design Institute, Shijiazhuang 050000, China |
|
|
|
|
Abstract Combined with geological and hydrologic conditions that main inclined shaft crossing, compared with main inclined shaft in technical terms, main inclined shaft construction method fit for the mine was put forward, which provided technical guidance for the construction and favorable condition for the rapid construction of the mine.
|
|
|
|
|
|