|
|
|
| Study on Thick Coal Seam Fully Mechanized Caving Face Production System Reliability |
| MIAO Chen |
| Changcun Mine, Shanxi Lu’an Group, Changzhi 046100, China |
|
|
|
|
Abstract In order to make sure the smooth running of thick coal seam mining of Changcun Mine, thick coal seam fully-mechanized caving production system was analyzed by reliability analysis theory, the data analysis showed that validity of the production system of full-mechanized caving mining face is 0.901 24. Fully mechanized caving face is a complex production system, which could improve the system stability by advancing the people-machine-environment reliability.
|
|
|
|
|
|
| [ 1 ] 王进军,陈光柱,夏小东. 煤矿井下救生舱舱体结构设计与分析[ J ]. 煤矿机械,2011,32(12 ):13 - 15.
[ 2 ] 李瑞根. 救生舱设备舱壳体有限元分析[ J ]. 煤矿机械,2013,34(5 ):119 - 120.
[ 3 ] 咸士玉. 狂用救生舱气密性试验研究[ J ]. 煤矿机械,2014,35(7 ):75-77.
[ 4 ] 余博龙,温禄淳,余 进,等. 煤矿井下用移动式救生舱的试验方法[ J ]. 煤矿安全,2011,42(8 ):171 - 174.
[ 5 ] 许 健. 煤矿救生舱中制冷装置研究[ J ]. 煤矿机械,2014,35(8 ):77-79.
[ 6 ] 李 蕾,毕 超. 瓦斯爆炸冲击载荷下的矿用可移动式救生 舱结构强度分析[ J ]. 煤矿机械,2013,34(12 ):9 - 93. |
|
|
|