|
|
|
| Study on Coal Roadway Tunneling Technology |
| ZHAO Ai-jun1,2 |
| 1. Mining Engineering Institute, Taiyuan University of Technology, Taiyuan 030024, China; 2. Production Technology Department, Shanxi Gaohe Energy Corporation Ltd., Changzhi 047100, China |
|
|
|
|
Abstract Based on the roadway construction, geological conditions of the changing situation, advancing construction and operation process were closely related to the site safety, mining capacity. In more and more complex human-computer interaction working face, more requirements construction excavation work was efficient, safe, steady. Mine roadway drivage technology was discussed, which had a certain reference.
|
|
|
|
|
|
| [ 1 ] 刘子港. 煤矿巷道掘进及其关键技术环节探讨[ J ]. 科学之友,2013(6):49 - 50.[ 2 ] 张艳辉,丁 力. 大倾角煤巷快速掘进技术[ J ]. 山东煤炭科技,2013,(5):83 - 84.[ 3 ] 马 健. 提高煤矿巷道掘进速度方法的应用[ J ]. 东方企业文化,2012(18):230. |
|
|
|