Abstract Zhangcun Mine of Jizhong Energy Corporation Ltd. 1817 working face came with waste water well, water yielded up to 140 m3 / h with high water pressure, large aperture, casing damage, hard field conditions, sealing is very difficult, by using drilling video, a variety of means such as closure, chemical grouting reinforcement and grouting for the integrated block, which got good effect.
|