|
|
|
| Reducing Filling Amount under Highway Mining Feasibility Analysis |
| TANG Dian-xi1, QIN Hong-yan2, DONG Qiang-qiang2 |
| 1. Xima Mine, Shenyang Mining Group Shenjiao Company, Liaoyang 111000, China; 2. School of Mining, Liaoning Engineering Technology University, Fuxin 123000, China |
|
|
|
|
Abstract When mine filling method was adopted to improve the production, filling height directly decided the filling velocity and filling cost, Xima Mine N-1205 and N-1206 working face were mining with paste filling. Probability integral method, the mathematical model was adopted to expect surface subsidence of N-1205 and N-1206 working face up and down boundary, which ensured the various deformation limit value under the condition of highway safety guarantee, the deformation limit value when the deep relationship with the filling height was calculated, the result showed that filling height could be reduced with large mining deep to reach the goal of improving the filling speed, reducing the filling cost.
|
|
|
|
|
|
| [ 1 ] 何国清,杨 伦. 矿山开采沉陷学[ M ]. 北京:中国矿业大学出版社,1991.[ 2 ] 王卓识. 西马煤矿北翼充填采区高速公路下开采可行性研究[ D ]. 阜新:辽宁工程技术大学,2013. [ 3 ] 黄建光.“三下”采煤技术现状及展望[ J ]. 煤炭科学技术,2002,20 (3):30 - 35.[ 4 ] 北京开采所. 煤矿地表移动与上覆煤岩破坏规律及其作用[ M ]. 北京:煤炭工业出版社,1981.[ 5 ] 秦洪岩. 西马煤矿高速公路下似膏体充填开采可行性研究[ D ]. 阜新:辽宁工程技术大学,2013.[ 6 ] 国家煤炭工业局. 建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程[ M ]. 2000. 6.[ 7 ] 连达军,汪云甲.“三下”开采综合评价体系研究[ J ]. 中国矿业大学学报,2005(1):100 - 104. [ 8 ] 李 俊,寇云鹏,杨 震,等.“三下”压煤充填开采研究现状综述[ J ]. 黑龙江科技信息,2012( 12 ):43 - 44. [ 9 ] 刘文斯. 浅析在复杂条件下“三下”压煤开采方案的选择[ J ]. 湖南安全与防灾,2012(4):52 - 53. [ 10 ] 姚 琦,冯 涛,李石林,等. 基于概率积分法的煤矿“三下”开采沉陷预计[ J ] . 煤矿安全,2012(7 ):188 - 190,193. [ 11 ] 陈 龙.“三下”采煤新技术[ J ]. 山东煤炭科技,2010(5):76 - 77. [ 12 ] 肖纪永. 浅谈填充开采方法在三下压煤条件下的应用[ J ].中国新技术新产品,2013(15):93 - 94. |
|
|
|