| Research on precise pre-splitting of roof and the size of coal pillar for village protection in fully mechanized caving face |
| Dong Fei |
| Changcun Mine, Shanxi Lu 'an Environmental Protection Energy Development Co., LTD., Changzhi 046000, China |
|
|
|
|
Abstract To explore the village protection coal pillar size and cut the top pressure relief to the surface protection, numerical simulation software of UDEC was used to verify the feasibility of different coal pillar retention schemes. From the perspective of the advanced influence range of mining on the surface, it was considered that the surface settlement could be controlled within a reasonable range by reducing the village protection coal pillar from 200 m to 180 m and cooperating with the roof cutting and pressure relief measures to achieve precise roof fracturing. This study provided reference for other similar mines.
|
|
|
|
|
|
| [ 1 ] 邓 宁. “三下”采煤技术发展现状及前景展望[ J ]. 中州煤炭,2011( 12 ):56 - 58.
[ 2 ] 宋高峰,刘会臣,任志成.“三下”压煤充填采煤技术发展现状及展望[ J ]. 煤矿安全,2014,45( 10 ):191 - 193.
[ 3 ] 黄艳利. 固体密实充填采煤的矿压控制理论与应用研究[ D ]. 徐州:中国矿业大学,2012. |
|
|
|