| Installation technology of fully mechanized mining face with large dip angle and variable slope and different coal thickness |
| Ma Yanchao |
| Jizhong Energy Fengfeng Group Co., Ltd., Handan 056000, China |
|
|
|
|
Abstract Taking the No.1101EX3 steeply inclined face of Tianshun Mine of Fengfeng Group Co., Ltd. as the background, aiming at the problems of different coal thicknesses on the variable slope of the working face, large dip angle of the coal seam in the open-off cut, and the falling or dumping of the fully mechanized mining equipment caused by the car plate downward transportation, the slideway was installed in the open-off cut, the shearer was installed in the upper part of the open-off cut, the winch and the lifting steel beam were installed in the chamber, and the installation technology of winch speed control, slipper auxiliary and equipment slow downward transportation was adopted to realize the smooth transportation of fully mechanized mining equipment. The installation and transportation of fully mechanized mining equipment under different coal thickness conditions of large dip angle and variable slope provided technical guarantee for the installation of subsequent working faces in the mine.
|
|
|
|
|
|
| [ 1 ] 高亚鹏.大倾角综合机械化采煤技术与安全管理[ J ]. 当代化
工研究,2020( 9 ):107 - 108.
[ 2 ] 张建民. 急倾斜煤层综合机械化采煤工艺研究与实践[ J ]. 矿
业装备,2019( 1 ):22 - 23.
[ 3 ] 王灿华,梁立勋,卓 军,等. 急倾斜综采工作面安全快速
安装工艺[ J ]. 煤矿安全,2015,46( 2 ):99 - 102.
[ 4 ] 朱若军,李志华,杨 科.大倾角大采高倾斜长壁工作面快速安装技术[ J ]. 煤炭工程,2014,46( 2 ):46 - 48.
[ 5 ] 张学忠,刘 波,苗继军,等. 综采工作面设备机械化安装技术研究与应用[ J ]. 煤炭工程,2013( 10 ):40 - 42.
[ 6 ] 屠洪盛. 急倾斜煤层综采工作面设备快速安装技术[ J ]. 煤矿安全,2011,42( 9 ):48 -50.
[ 7 ] 王金生. 急倾斜中厚煤层综采设备安装工艺的实践[ J ]. 煤炭
技术,2011( 7 ):71 - 72.
[ 8 ] 王之永. 综采工作面快速安装技术[ J ]. 煤炭科技,2011( 3 ):50 - 51.
[ 9 ] 伍永平,解盘石,王红伟,等. 大倾角煤层开采覆岩空间倾斜砌体结构[ J ]. 煤炭学报,2010,35( 8 ):1 252 - 1 256.
[ 10 ] 林爱芳,王洪林. 急倾斜煤层综放工作面回撤工艺技术[ J ]. 煤炭技术,2007( 9 ):53 - 55.
[ 11 ] 谢俊文,高小明,上官科峰. 急倾斜厚煤层走向长壁综放开采技术[ J ]. 煤炭学报,2005,30( 5 ):545 - 549. |
|
|
|