|
|
|
| Study and application on rock roadway fast driving line of fully mechanized driving in Jiulong Mine |
| Wang Zhaorui, Dai Weilin |
| Jiulong Mine, Jizhong Energy Fengfeng Group Baofeng Mining Co. , Ltd., Handan 056200, China |
|
|
|
|
Abstract With the continuous mining of coal mine, the contradiction of mining and driving are becoming increasingly prominent, especially the rock roadway excavation seriously restricts the connection and layout. In order to explore the rapid excavation of rock roadway, the comprehensive excavation rapid excavation line in 15249s top extraction roadway was arranged in Jiulong Mine. The mechanized operation line of cantilever roadheader, bridge type belt conveyor, extensible belt conveyor was adopted in the rock roadway. The management innovation was actively carried out, the roadway layer was reasonably selected, and the support design was continuously optimized, so as to overcome the high hardness of rock complex quality conditions, the whole rock section of the roadway with a length of 13m2 was 208m per month.
|
|
|
|
|
|
| 1 ] 王 虹. 我国煤矿巷道掘进技术和装备的现状与发展[ J ]. 煤
炭科学技术,2010,38( 1 ):57 - 62.
[ 2 ] 赵宏伟. 我国煤矿岩巷快速掘进技术现状及展望[ J ]. 煤炭科学技术,2012,40( 1 ):5 - 7.
[ 3 ] 曹飞飞. 岩巷快速掘进优化设计及应用[ D ]. 邯郸:河北工程大学. 2014.
[ 4 ] 马 利. 岩巷机械化快速掘进技术及其在邢台矿区的应用研究[ D ]. 北京:中国矿业大学(北京). 2012.
[ 5 ] 张忠国. 煤巷快速掘进系统的发展趋势与关键技术[ J ]. 煤炭科学技术,2016,44( 1 ):55 - 60.
[ 6 ] 王国法,杜毅博. 智慧煤矿与智能化开采技术的发展方向[ J ]. 煤炭科学技术,2019,47( 1 ):1 - 10. |
|
|
|