| Application of fully automated grouting system in Zhaogu No. 2 Mine |
| Wang Kai, Wang Xu, Xu Zhiyuan, Meng Xianwei |
| The Third Hydrogeological Team of China Coal Geological Administration, Handan 056001, China |
|
|
|
|
Abstract The overall area of the -910 m water warehouse and part of the main road in Zhaogu No. 2 Mine was monoclinic structure, and the bottom plate of the No. 二1 coal seam was relatively broken due to the influence of the F17-1 boundary fault. In order to guarantee the safety of underground construction and ensure the efficient and fast mining, the L8 tuff water-bearing layer of the bottom plate of the coal seam was investigated and reinforced by using the ground area overrun grouting reinforcement management technology. This project adopted advanced fully automated grouting system, which guaranteed the quality of grouting while improved project management and quality, reduced management costs.
|
|
|
|
|
|
| 1 ] 李长青,方 俊,李泉新,等. 煤层底板超前注浆加固定向孔注浆工艺技术[ J ]. 煤田地质与勘探,2014( 4 ):59 - 63.
[ 2 ] 陈 通,王苏健,冯 洁,等. 全自动煤层底板注浆工艺系统的研究与应用[ C ]//中国地质学会2015学术年会论文摘要汇编(下册),2015. |
|
|
|