|
Abstract In order to solve the problem of water production during the mining of 21215 working face in Dongpan Mine, combining with geological and hydrogeological conditions of the working face, through comprehensive detection techniques such as geophysical and drilling, it was concluded that there was no floor water and old goaf water in the working face, where the working face could be conducted by recovery mining.
|