煤炭与化工
Home  |  (对应重点客户)不要改栏目名称  |  Message  |  中文
CCI
Current Issue| Next Issue| Archive| Adv Search |
Slope stability study and control measures of Jiangjun gobi No. 2 open-pit Mine
Sun Jinbu 1, Wang Zhengguo 2
1. Jiangjun Gobi No. 2 Open-pit Mine, Xinjiang Tiandi Energy Corporation Ltd.,  Fukang 831599, China;
2. Qitai Yindu Construction Engineering Corporation Ltd., Changji 831800, China


Copyright © CCI
Supported by: Beijing Magtech