| [ 1 ] Dahan O, Nativ R, Adar E M, et al. On Fracture Structure and Preferential Flow in Unsaturated Chalk[ J ]. Ground Water, 2010,
38( 3 ):444 - 451.
[ 2 ] 赵崇栋,冯井龙,陈 涛. 区段煤柱中巷变形失稳特征及控制对策探讨[ J ]. 山东煤炭科技,2013( 5 ):145 - 146.
[ 3 ] 李泽龙. 综放工作面应力分布规律的数值模拟研究[ J ]. 煤,2017,26( 3 ):10 - 11.
[ 4 ] Jia X R, Wang L. The Theoretical Calculation Method of Critical Width for the Coal Pillar of the Roadway[ J ]. Journal of Taiyuan University of Technology, 2011.
[ 5 ] Bienawski Z T. A design procedure for improved room-and-pillar coal mining[ J ]. Prepr. Soc. Min. Eng. AIME; ( United States ), 1983, 83 - 110.
[ 6 ] Russell Frith,Guy Reed. Limitations and potential design risks when applying empirically derived coal pillar strength equations to real - life mine stability problems[ J ]. International Journal of Mining Science and Technology, 2018.
[ 7 ] Christopher Mark, Zach Agioutantis. Analysis of coal pillar stability (ACPS): A new generation of pillar design software [ J ]. Interna-
tional Journal of Mining Science and Technology, 2018.
[ 8 ] Ashok Kumar, Petr Waclawik, Rajendra Singh, Sahendra Ram, Jiri Korbel. Performance of a coal pillar at deeper cover: Field and simulation studies[ J ]. International Journal of Rock Mechanics and Mining Sciences, 2019, 113.
[ 9 ] 何鑫瑞. 不同采、留煤柱宽对地表移动规律的影响分析[ J ]. 煤矿现代化,2018( 1 ):135 - 137.
[ 10 ] 陈 通,王双明. 基于切顶卸压技术的导水裂隙带发育规律[ J ]. 煤炭技术,2017,36( 12 ):124 - 126.
[ 11 ] 赵华安,赵光明,孟祥瑞. 断层下盘留煤柱开采数值模拟[ J ]. 煤矿安全,2015,46( 03 ):37 - 40.
[ 12 ] 董 羽,黄玉诚,邓和浪,等. 基于FLAC~(3D)的公路下压煤巷式充填开采数值模拟分析[ J ]. 煤矿安全,2014,45( 6 ):163 - 165,169.
[ 13 ] 史文豹. 原巷充填无煤柱掘巷技术研究[ D ]. 淮南:安徽理工大学,2014.
[ 14 ] 乔建华. 长壁留煤柱法开采煤柱破坏过程数值模拟研究[ J ]. 陕西煤炭,2013,32( 1 ):35 - 37.
[ 15 ] 胡 城. 带煤柱开采条件下巷道矿压显现规律[ J ]. 煤炭技术,2009,28( 8 ):64 - 65. |