| Study on mining pressure appearance and support countermeasures in crossing empty roadway of Jingfang Mine |
| Ma Ning |
| Shanxi Changzhi Jingfang Coal Industry Corporation Ltd., Changzhi, 047100, China |
|
|
|
|
Abstract By calculating the roofing pressure and the support strength of crossing 3-05 working face empty roadway, the size of the mine pressure before and after crossing empty roadway was compared, and the top and bottom plates within the influence range of mining was observed. The amount of the approaching and the fault repairing work of the strengthening support system were carried out, and the corresponding comprehensive control technology of the anchor cable reinforcement support was proposed. The research showed that the strengthening support measures of the anchor bolt and the wooden column combined support when the working face passing the empty roadway ensured the smooth and safe mining of the working face.
|
|
|
|
|
|
| [ 1 ] 谢生荣,岳帅帅,陈冬冬,等. 深部充填开采留巷围岩偏应力演化规律与控制[ J ]. 煤炭学报,2018,43( 7 ):1 837 - 1 846.
[ 2 ] 刘 畅,弓培林,王 开,等. 长壁复采面连续过空巷耦合支护机理研究[ J ]. 矿业研究与开发,2015,35( 4 ):38 - 41.
[ 3 ] 武越超,韦志远,谭英明. 空巷影响下回采巷道围岩稳定性及支护设计研究[ J ]. 煤炭科学技术,2016,44( 5 ):128 - 132,139.
[ 4 ] 尹超宇,冯光明,高 鹏,等. 工作面过空巷围岩失稳机理研究[ J ]. 采矿与安全工程学报,2018,35( 3 ):457 - 464.
[ 5 ] 郑文翔. 长壁工作面过空巷顶板稳定性动态特征研究动态[ J ]. 煤矿安全,2014,45( 4 ):51 - 53,57.
[ 6 ] 谢生荣,李世俊,魏 臻,等. 综放工作面过空巷时支架-围岩稳定性控制[ J ]. 煤炭学报,2015,40( 3 ):502 - 508. |
|
|
|