|
Abstract Based on the unreasonable design of the gas drainage chamber section in the original working face of Zhaozhuang Mine, which led to the poor forming of the chamber, the slow construction speed and the constant construction of the mining machine. The chamber section was optimized from rectangle to right Angle trapezoid, improving the construction efficiency of the gas drainage diverting chamber and improving the construction speed, the chamber well formed, the roof was effectively controlled.
|