|
Abstract 10202 fully mechanized working face one time mining height of Ciyaogou Mine of Shanxi Coal Transportation Group was taken as example, rib spalling, support remove, wasted coal rolling in the working face were analyzed, the corresponding measures of supporting equipment optimization of the three machines and recovery process, weakening control of hard roof and safety control of coal wall were given, with good application effect.
|