Based on poor ventilation and pre-pumping gas in 12706 working face of Taoyi Mine, through the technology research, high pressure water fracturing antireflection technology was adopted, which improved coal seam gas drainage effect and reduced face dust concentration, improved the working environment underground,but also provided experience for similar face.
刘 炜. 顺煤层钻孔高压水力压裂增透技术研究与应用[J]. 煤炭与化工, 2014, 37(8): 43-44.
LIU Wei. Research and Application of Drilling Hole along Coal Seam High Pressure Hydraulic Water Fracturing Antireflection. CCI, 2014, 37(8): 43-44.