In the process of the ventilation system tunneling faces formation, needed different function to design and construct ventilation vertical eye, achieve effective ventilation purposes, solve Zhaozhuang No.2 Mine 1308 drain shaft straight and reverse mining ventilation problem during construction, studying the ventilation vertical eye rapid construction technology had positive reference value for the ventilation vertical eye, slipped coal eyes construction in the future.
邢 超. 深孔钻爆法快速施工通风立眼工艺研究[J]. 煤炭与化工, 2014, 37(7): 85-87.
XING Chao. Study on Deep Hole Drilling and Blasting Method of Rapid Construction Ventilation vertical Eye Technology. CCI, 2014, 37(7): 85-87.