Based on Wutongzhuang Mine dedicated railway on the large amount, high along the embankment, bridges, culverts and other ancillary facilities, mining protective coal pillar of the problem of the great impact on the safety of railway transportation, the specific situation was analyzed. The design of downhole working face was optimized. Scientific maintenance of various facilities were conducted along the railway, realized the railway protecting the safety of the coal pillar mining.
孔祥利. 高路堤多桥涵铁路下采煤技术研究[J]. 煤炭与化工, 2014, 37(1): 109-111.
KONG Xiang-li. Coal Mining Technology Research under High Embankment Multiple Bridges and Culverts. CCI, 2014, 37(1): 109-111.