The actual construction steps in the repair process of the coke oven wall was discussed. Through the carbonization chamber of the coke oven, the temperature control and temperature reduction operation was carried out, and finally the construction requirements were met. After repairing the furnace wall of No.76 carbonization chamber, it effectively solved the problem of restricting production, prolonged the service life of the coke oven, and accumulated valuable experience for future work.
李大伟. 峰煤焦化76号炭化室炉墙修补实践[J]. 煤炭与化工, 2019, 42(9): 111-114.
Li Dawei. Practice of repairing furnace wall of No.76 carbonization chamber of Fengfeng Coking Group. CCI, 2019, 42(9): 111-114.