In view of the increase of water consumption need in Mugua Mine and the insufficiency of living and production needs, the water supply pipe network was optimized to improve the water recycling efficiency of the production water. Practice proved that the treated water quality met the requirements of water quality, which could be reused as production water, ensuring the safe production of coal mines, reducing the production cost of coal mines and the waste of water resources.