煤矿污水处理厂土建阶段施工要点及质量控制策略研究
梁钰祥
霍州煤电集团 吕临能化煤电综合项目部,山西 吕梁 033299
Construction and quality control of mine sewage disposal plant civil engineering
Liang Yuxiang
Lvlin Nenghua Coal and Electricity Department, Huozhou Coal and Electricity Group, Lvliang 033299, China
摘要 为有效促进土建阶段施工的顺利运行,对施工情况进行分析,并根据污水处理厂处理工艺流程图,分析煤矿污水处理厂土建阶段的施工要点,从而提出了相应的控制策略。结果表示,煤矿污水处理厂的土建阶段和一般的土建工程有所不同,施工单位要注意在土建阶段的施工要点和质量控制,确保污水处理厂的安全高效运行。
关键词 :
煤矿污水处理厂 ,
土建阶段 ,
质量控制
Abstract :Based on the civil engineering of sewage disposal plant and its technology process, the key of construction and control plan were given. The result shows that the construction of sewage disposal plant is different from other engineering, which are needed to pay attention to so that it can make sure the safe operation of it.
Key words :
mine sewage disposal plant
civil engineering
quality control
作者简介 : 梁钰祥( 1988— ),男,山西五台人,助理工程师。
[ 1 ] 刘元君. 浅析煤矿污水处理厂污泥处理问题[ J ]. 能源与节能, 2016( 7 ):106 - 107.
[ 2 ] 何召进. 煤矿污水处理厂滤料装配及结构的革新应用[ J ]. 经济管理:全文版,2016( 6 ):153.
[ 3 ] 李广恩,程怀颖. 南屯煤矿生活污水处理厂节能降耗的做法和体会[ J ]. 能源环境保护,2016,30( 4 ):63 - 64.
[ 4 ] 朱 艳,李曙生,曹元军. 基于GPRS的煤矿污水集中监控系统设计[ J ]. 煤矿机械,2015,36( 10 ):266 - 267.
[1]
刘文燕,陈锦赠,厉延焕. 聚乙烯管道焊接质量控制 [J]. 煤炭与化工, 2017, 40(6): 145-147.
[2]
杨 斌. GPS基线解算质量控制及处理方法研究 [J]. 煤炭与化工, 2017, 40(11): 116-118.
[3]
李云霞,秦雪健. 充填式注浆法在煤矿采空区治理工程中的应用 [J]. 煤炭与化工, 2016, 39(4): 129-132.
[4]
刘晓建. 环境监测质量保证措施分析 [J]. 煤炭与化工, 2016, 39(3): 158-160.
[5]
孙长江. 带有侧线返回进料的低温精馏塔开工过程动态模拟研究 [J]. 煤炭与化工, 2015, 38(5): 117-120,153.
[6]
冯云飞. 质量控制活动提升实验室检验检测能力 [J]. 煤炭与化工, 2014, 37(4): 83-84,87.