Based on traditional data processing system was unable to meet demand of modern coal mine production, a new system was designed and studied. In this system, error estimation module included overall error analysis, as well as deviation on the connection line caused by each measuring edge and angle of measurement. Then, position and number of gyro edges could be completed so that users could complete mine survey data processing according to the scheme. The result showed that this system had relatively high practical value.