Roadway penetration was a common project in coal mine production, the accuracy of penetration directly affected mining work in underground coal mine. In order to improve accuracy of breakthrough survey, two measurement methods of total station and GPS measurement were adopted and contrasted, reasonable measurement schemes were chosen according to needs of different environment. System error was reduced through technical means to ensure connection project meeting specified requirements.