Based on parameters of GPS control points near wellbore between +370 m horizontal main haulage roadway and +520 m return air roadway in Hongyuan Mine, reasonable measuring circuit was designated by considering its breakthrough precision and traditional theodolite traverse coordinating with measurement of gyroscopic directed edge was selected according to reality. Internal work calculating and field operation on the basis of traverse survey was elaborated; meanwhile, its measuring error was predicted. As a result, adjustment of waistline in roadway was set forth through analysis of actual deviation.
邓生强. 宏远煤矿一区运煤上山贯通测量[J]. 煤炭与化工, 2017, 40(1): 117-119,160.
Deng Shengqiang. Breakthrough survey of carrying coal to mountains in one area of Hongyuan Mine. CCI, 2017, 40(1): 117-119,160.