Based on the gas concentration overrun in sealing wall, combined with strata condition, grouting reinforcement was conducted in 5 sealing wall and sealed roadway, good chemical material was selected to prevent air leakage, the technology constrains the leakage of gas and other dangerous gas before the sealing wall, controls gas concentration before sealing, ensures the normal concentration of gas before sealing wall and lays foundation for safe production of mine.