Based on the summary of the basic data of the pump-groundwater test and the drilling parameters of drawdown and water, the feasibility of pump-groundwater on the ground was demonstrated in Xinshanghai No. 1 Mine. The results not only provided scientific basis for optimizing layout, but also showed example for northwest arid desert regions similar hydrogeology and made up the lack of domestic research.
[ 1 ] 段中会,牛建国,崔帮军. 神府矿区首采高产高效工作面疏降水方法[ J ].中国煤川地质,1996,8( 2 ):31 - 33.[ 2 ] Sui Wanghua, Yang Siguang. Study on the safety pillars under water-bearing strata of mining thick coal seam using fully mechanized sub-level caving method in Taiping coalmine [ J ]. Shandong Province, China. Proc. of the 2nd international conference on NDRM, 2002,Rinton Press, USA. 487 - 490.[ 3 ] 许光泉,沈慧珍.疏降地下水引起地面塌陷浅析-以淮南煤矿区为例[ J ].中国地质灾害与防治学报,2004,15( 4 ):64 - 68.