Based on the change of Dongpang Mine original coal quality, fine grained coal increased, cleaned coal quality declined, technical experience of the the coal preparation plant was introduced, coal preparation process was optimized, high moisture of cleaned coal was solved, which improved the quality of the cleaned coal and get better economic benefits.