Based on time and space influence problem between working face recovery and prepared mining area uphill roadway, through the theoretical calculation and analysis of empirical data, it was got that working face recovery exerted influence on prepared mining area uphill roadway. Adjusting mining production time and optimizing construction organization process were put forward, improving mining area roadway support strength could control the time and scope of the influence, provided technical experience and reference for similar conditions.
马旭克. 工作面回采对准备采区底板巷道时空关系影响分析[J]. 煤炭与化工, 2015, 38(1): 133-135.
MA Xu-ke. Analysis on Working Face Recovery Time and Space Influence on Prepared Mining Area Bottom Roadway. CCI, 2015, 38(1): 133-135.