Based on the geological data obtained in exploration about working face 112124 and the characteristics of water inrush, according to hydrogeological conditions work of the working face, and the hydrogeological data of working face floor water bursting and water inrush project, through disussing the water burst direct and indirect reasons of water inrush accident causes were analyzed, the accident lesson was summarized, which provided experience and reference for the similar conditions.
关永强. 黄沙矿112124掘进工作面突水原因分析[J]. 煤炭与化工, 2015, 38(1): 24-27.
GUAN Yong-qiang. Analysis on Cause of Water Rush in the 112124 Driving Working Face of Huangsha Mine. CCI, 2015, 38(1): 24-27.