In order to improve the accuracy and reliability of mine cut- through measurement, the measurement scheme was conducted by optimization design and error analysis, mainly aimed at the ground plane and elevation control survey, plane and vertical connection and underground traverse survey scheme and measurement error analysis, error prediction of the horizontal important direction in the X direction error and versed in meeting point in the Y direction error was expected, the results showed that the well versed in meeting point K on the level and elevation were not beyond the range of error of engineering required, the selected scheme could satisfy the construction requirements and construction methods.