Based on the wind speed out of limits in No. 15 coal seam eastern air return roadway of Yixin Mining Industry, south wing auxiliary air return roadway was proposed, which alleviates wind speed out of limits. Based on geological data, the mining of the south wing roadway may disclose 15 m fall of F13 fault. Pre-mining method was adopted finally after analyzing the four plans.