Zhangcun Mine of Jizhong Energy Corporation Ltd. 1817 working face came with waste water well, water yielded up to 140 m3 / h with high water pressure, large aperture, casing damage, hard field conditions, sealing is very difficult, by using drilling video, a variety of means such as closure, chemical grouting reinforcement and grouting for the integrated block, which got good effect.
路军臣,王恒泽. 高压大流量出水钻孔井下快速封堵研究[J]. 煤炭与化工, 2014, 37(8): 109-111.
LU Jun-chen, WANG Heng-ze. Study on High Pressure Large Flow Water Drilling Downhole Quick Plugging. CCI, 2014, 37(8): 109-111.