Through the kailuan jing area mining branch potentialities and 1195 mining working face were analyzed, and concluded that the construction technology of fault pyramid shed, with a specific instance of the confirmed the impact on the fault mining face the construction technology, can greatly improve the efficiency of coal mine safety in production, and achieve significant economic results.
刘洪斌,刘 鑫,张振宇. 复采挖潜工作面过断层研究[J]. 煤炭与化工, 2014, 37(1): 134-135.
LIU Hong-bin, LIU Xin, ZHANG Zhen-yu. Complex Mining Potential Tapping Working Face Crossing Fault research and discussion. CCI, 2014, 37(1): 134-135.