|
Abstract Yuenan Mining Industry combined the geological conditions of transportation lane with finite element theory, the main anchor supporting parameters were got by theoretical calculation, 19101 transportation lane support design was put forward, monitoring point was set to conduct field monitoring, the monitoring point on site showed that good support effect was got when roof and baseboard close quantity was 137 mm, two rib close quantity was 153 mm, which realized good technical and economic effect.
|