|
|
|
| Research on differentiated collaborative support technology of high stress soft rock roadway |
| Li Yong |
| Zhengzhou Coal Industry (Group) Co., Ltd., Zhengzhou 450000, China |
|
|
|
|
Abstract In order to solve the technical problems of support and floor heave treatment of high stress soft rock roadway and ensure the safe use of roadway, the instability and failure mechanism of roadway support under the influence of complex mining in No.31151 return air roadway of Yanghe Coal Industry were analyzed. Numerical simulation technology was used to analyze the stability of surrounding rock and study the floor heave mechanism and surrounding rock control technology of high stress soft rock roadway. The targeted bolting scheme of bolt-mesh-cable and the technical scheme of bolting net cable of bottom plate plus grouting support were proposed. The field practice showed that after the two sections of roadway were affected by mining, the maximum separation depth of roadway was 1.8 m, the maximum displacement was 210 mm, and the maximum floor heave was 230 mm. All the maximum deformation was within the allowable deformation range of design, and the support strength met the requirements of roadway support.
|
|
|
|
|
|
| [ 1 ] 刘玉卫,商铁林,张亚峰,等.采掘影响下巷道底板的破坏分析与底鼓治理[J].黑龙江科技大学学报,2021,31( 5 ):546 - 553.
[ 2 ] 刘成明,陈旱生. 复杂巷道底臌治理技术的应用实践[ J ]. 煤炭技术,2009,28( 12 ):161 - 162.
[ 3 ] 郭瑞瑞,牛同会. 动压软岩巷道底臌机理及防治技术[ J ]. 陕西煤炭,2014,33( 1 ):50 - 51,39.
[ 4 ] 李宗岑. 教学三矿轨道巷底鼓机理及控制技术研究[ D ]. 焦作:河南理工大学,2011.
[ 5 ] 王延林. 底抽巷二次锚网索喷协同支护技术研究与应用[ J ]. 山东煤炭科技,2019( 10 ):54 - 56. |
|
|
|