| Study on comprehensive geophysical exploration design and construction method of irregular working face |
| He Jigang |
| Yangdong Mine, Jizhong Energy Fengfeng Group Co., Ltd, Handan 056200, China |
|
|
|
|
Abstract The triangular coal generated in the process of coal mine working face layout, the working face delineated by geological structures such as faults in complex geological areas, and the coal pillar working face left by mining and excavation could produce relatively irregular working faces. Talking Yangdong Mine as an example, by comparing the difference between irregular working face and regular working face, combined with comprehensive geophysical exploration including the transient electromagnetic and radio wave tunnel perspective detection principle and field construction technology, the preliminary design was completed based on the theory, then the geophysical exploration layout was set up according to the actual construction conditions, which ensured the working face water prevention and control and geological work requirements, and provided guarantee for coal mine safety production.
|
|
|
|
|
|
| [ 1 ] 郭绍华. 异形工作面无线电波坑道透视工作布置方法研究及意义[ J ]. 煤炭与化工,2019,42( 8 ):53-56.
[ 2 ] 吴正飞,韩德品,王 程,等. 综采工作面薄煤带范围精细综合物探[ J ]. 煤矿安全,2014,45( 12 ):68 - 71.
[ 3 ] 孙雪亮,王 鹏. 基于瞬变电磁法的立槽煤采空区结构探测[ J ]. 煤矿安全,2017,48( 1 ):123 - 125.
[ 4 ] 张龙科,罗荣荣. 矿井瞬变电磁在老巷探测中的应用[ J ]. 陕西煤炭,2021,40( 4 ):130 - 132. |
|
|
|