| Research and application of abandoned roadway grouting filling technology in fully mechanized mining face |
| Fan Weijun |
| Shanxi Jinmei Tisco Energy Co. LTD, Lvliang 033207, China |
|
|
|
|
Abstract In order to improve the reinforcement strength of the abandoned roadway during the mining of Wangzhuang Mine No.13031working face and ensure the safety of the working face passing through the roadway, the grouting filling reinforcement scheme was proposed. Through numerical simulation and experiment, the results showed that if no measures weree taken to fill and strengthen the roadway, the surrounding rock would be seriously damaged and deformed after the working face was mined to the position less than 10m away from the abandoned roadway.It was studied and analyzed that the reasonable strength of the filling body when the filling reinforcement measures were taken in the goaf was 4 MPa, the high water material was used for filling, and the optimum water cement ratio was determined to be 4∶1. The field application practice showed that after the filling and reinforcement measures were taken in advance, there was no obvious difference between the working resistance of hydraulic support and the condition of coal wall slope when the working face passed through the goaf and normal mining, indicating that the filling and reinforcement scheme achieved the expected effect.
|
|
|
|
|
|
| [ 1 ] 赵 刚. 井下回采作业面过空巷技术分析[ J ]. 能源与节能,2021( 5 ):134 - 135.
[ 2 ] 昝宏波. 综采工作面过空巷支护技术研究[ J ]. 当代化工研究,2021( 10 ):59 - 60.
[ 3 ] 刘 洋. 2303综放工作面过空巷技术探讨究[ J ]. 江西煤炭科技,2021( 2 ):66 - 68.
[ 4 ] 赵太国. 综放工作面过空巷技术研究[ J ]. 机械管理开发.2021,36( 4 ):151 - 152.
[ 5 ] 范江涛. 浅谈复采工作面充填过空巷回采技术[ J ]. 煤,2021,30( 3 ):49 - 51.
[ 6 ] 谭卫东. 高水充填材料在采煤工作面过空巷中的应用[ J ]. 山东煤炭科技. 2021,39( 1 ):193 - 195.
[ 7 ] 朱占林. 晋北煤业5-103工作面过空巷充填技术研究[ J ]. 能源与节能,2020( 10 ):146 - 147.
[ 8 ] 邓照玉,何明川. 综采工作面通过走向空巷充填技术研究与实践[ J ]. 矿业安全与环保,2020,47( 3 ):64 - 69. |
|
|
|