|
|
|
| Study on the prevention of recovery mining caving roof technology in fully mechanized mining face and roadway |
| Shi Jinsong, Wei Luhao, Cheng Lingyu |
| Shanxi Yami Daning Energy Corporation Ltd., Jincheng 048114, China |
|
|
|
|
Abstract In order to solve the problem of broken roof and poor stability caused by the influence of super mining influence in the 306 comprehensive mining face and the down-slot of Daning Mine, the prevention of roof caving control technology combining cement slurry over-slurry coal reinforcement in the down-slot and local roof chemical slurry reinforcement in the geological anomaly area of the comprehensive mining face was given. The results showed that the technical solution effectively increased the rock strength of the roof sides of the comprehensive mining face and the down-slot, thus enhanced the stability of the surrounding rock, and the deformation was within the controllable range through the observation of the top sides shift, and the phenomenon of flaking and roofing did not occur on the face and the down-slot, which realized the safe and efficient recovery of the comprehensive mining face.
|
|
|
|
|
|
| 1 ] 康红普,张 镇,黄志增. 我国煤矿顶板灾害的特点及防控
技术[ J ]. 煤矿安全,2020( 10 ):24 - 33,38.
[ 2 ] 张中雨,冯屯生. 煤矿综采工作面顶板支护管理研究[ J ]. 山
东煤炭科技,2020( 10 ):198 - 200.
[ 3 ] 党 伟. 深部采动巷道顶板稳定性的分析和控制[ J ]. 能源与
节能,2020( 10 ):11 - 12,14.
[ 4 ] 陈国鹏. 复合顶板巷道稳定性控制研究[ J ]. 煤,2020( 11 ):
20 - 21,30,76.
[ 5 ] 曹成君. 超前注浆及注浆锚杆在顶板破碎中的应用[ J ]. 煤,
2020( 11 ):29 - 30.
[ 6 ] 常文廷. 复合顶板巷道锚网索喷及注浆加固技术研究[ J ]. 能
源与节能,2020( 10 ):103 - 105.
[ 7 ] 晁先进. 回采工作面破碎顶板注浆加固技术及应用[ J ]. 煤炭
科技,2020( 5 ):78 - 79. |
|
|
|