|
Abstract In order to solve the problem of roadway support in high stress and broken surrounding rock, through the method of theoretical analysis, numerical simulation and field measurement, the staged high pre-stress bolt (cable) mesh coupling support and two-stage comprehensive support system for 12590 track roadway were successfully carried out, and the important project was realized, with significant economic and social benefits.
|