| Analysis on optimization of gas drainage pipe network system in Datun Mine |
| Jia Changzhong, Guo Hailiang |
| Tianyu Mining Industry Corporation Ltd., Yangquan Mining Group, Xinzhou 034000, China |
|
|
|
|
Abstract In order to optimize the gas drainage system, the No. 3 transportation roadway of 16 was chosen as the test point to set up different drainage plans, the most optimized negative pressure was 35 kPa, the reasonable diameter was got by calculation, improving gas piping system and providing technical basis for gas drainage of the mine.
|
|
|
|
|
|
| [ 1 ] 刘金龙. 铁法矿区大兴矿瓦斯抽放技术研究[ D ]. 辽宁工程技术大学,2015.
[ 2 ] 肖俊贤,李希建. 发耳矿井瓦斯抽采半径的测定[ J ]. 煤炭技术,2016( 5 ):98.
[ 3 ] 陈守坤. 基于Fluent-tecplot的穿层抽采钻孔周围煤体瓦斯流动模拟研究[ J ]. 煤炭技术,2016,2( 4 ):83 - 85.
[ 4 ] 刘增超. 综放采空区风流场CFD数值模拟研究[ D ]. 西安科技大学,2015.
[ 5 ] 汪有清. 底抽巷上向穿层钻孔抽放远程卸压瓦斯技术研究[ D ]. 安徽理工大学,2016.
[ 6 ] 王红刚. 采空区漏风流场与瓦斯运移的叠加方法研究[ D ]. 西安科技大学,2015. |
|
|
|