|
Abstract Fully mechanized working face crossing empty roadway remains a difficult in mining area. By analyzing reaction mechanism, material properties and mechanical properties of ultra-high water materials, filling technology of ultra - high water material was studied. The Field response showed that super high-water material with short setting time, good pumping performance, adjustable strength, simple process and less material use, short cycle, quick effect, low cost, met the needs of filling empty roadway.
|