|
Abstract Based on the difficult withdraw of support and broken roof and floor with big pressure of 12516 fully mechanized working face air roadway, the support, shrinkage mining, support moving, support set and support withdraw technology were studied, withdrawing two supports at one time was adopted, which improved the support level and mining speed, controlled the broken area effectively, with economic effect.
|