|
|
|
| Study on failure characteristics of 15445N working face floor in Jiulong Mine |
| Zhao Zhang1, Bai Fengqing2, Chen Shaoshuai2, Wang Penghao2 |
1. Jiulong Mine of Jizhong Energy Fengfeng Group, Handan 056200, China; 2. Hebei University of Engineering,
Handan 056038, China |
|
|
|
|
Abstract Based on floor threat of Ordovician limestone water when mining 4#coal in Jiulong Mine, methods of underground borehole water injection and indoor numerical simulation were used to detect destroyed depth and study failure law in 4# coal. The results showed that the mining effect to the monitoring point occurred in a distance of about 66m, the more superficial monitoring point was, the farther distance would be; scope of mining influence was in the range of 20 ~ 55 m, greatest damage located in the front side of working face about 5 m and maximum damage depth was approximately 34 m.
|
|
|
|
|
|
| [ 1 ] 白峰青,王 斌,刘 猛. 巨厚坚硬顶板工作面的底板破坏规律[ J ]. 矿业工程研究,2014( 03 ):38 - 43.
[ 2 ] 于小鸽. 采场损伤底板破坏深度研究[ D ]. 青岛:山东科技大学,2011.
[ 3 ] 武龙飞,瞿群迪. 朱村矿承压水上膏体充填开采底板破坏规律研究[ D ]. 徐州:中国矿业大学,2008.
[ 4 ] 孟召平,高延法,卢爱红. 矿井突水危险性评价理论与方法[ M ]. 北京:科学出版社,2011.
[ 5 ] 王秋生,姜玉海. 底板破坏深度动态监测技术的应用[ J ]. 煤矿安全,2011,42( 12 ):90 - 92.
[ 6 ] 张 蕊,姜振泉,于宗仁. 煤层底板采动破坏特征综合测试及数值模拟研究[ J ]. 采矿与安全工程学报,2013,30( 4 ):521 - 537.
[ 7 ] 孙娈娈,汪华君. 煤层底板破坏流固耦合数值模拟[ J ]. 煤田地质与勘探,2013,41( 3 ):55 - 58.
[ 8 ] 张 蕊,姜振泉. 采动条件下厚煤层底板破坏规律动态监测及数值模拟研究[ J ]. 采矿与安全工程学报,2012,29( 5 ):626 - 630. |
|
|
|